

🧴 Unlock your scalp’s true potential with pro-level care—because your confidence deserves it.
Therapro Mediceuticals Scalp Treatment 3 Piece Kit is a comprehensive, dermatologist-grade system designed to effectively control dandruff and psoriasis symptoms. Featuring a pre-treatment wash, medicated shampoo, and conditioning rinse, this USA-made kit targets flaking, itching, and redness to restore scalp health without a prescription.










| ASIN | B00R4X922I |
| Best Sellers Rank | #192,320 in Beauty & Personal Care ( See Top 100 in Beauty & Personal Care ) #656 in Scalp Treatments |
| Customer Reviews | 4.0 4.0 out of 5 stars (57) |
| Is Discontinued By Manufacturer | No |
| Item model number | med-3-peace-kit |
| Manufacturer | Therapro MEDIceuticals |
| Package Dimensions | 7.8 x 4.92 x 2.64 inches; 1.58 Pounds |
| UPC | 054355920018 |
Y**M
Amazing products
I’ve been using the pro products for years and years and years. These are amazing. They are a menace. You can purchase these without a prescription and works the same as any prescription product even better.
C**L
Cleared Up Grainy Scalp
I had been suffering with unexplainable "grainy" scalp for awhile. Nothing cleared it up. I saw countless drs for it. Tried every shampoo, diet and hack that I could. Nothing helped. This 3 piece kit did the trick. My scalp no longer has grains or dandruff.
A**O
Five Stars
I love this product, it just took a long time to get here.
R**K
I do not recommend
The shampoo doesn't work! I started having terrible breakouts. My skin cracked and bled. I don't recommend buying it! I found a better alternative
T**A
Good for psoriatic scalps
Nice system. Soothing. Really helps psoriatic scalps.
A**A
Never received this product
I never received this product I have written you twice about it I would’ve loved to of received this product but I cannot write a review about it because I never received it please credit my account immediately I hate to Write a negative review as I have never had to do so on Amazon but $45 is a lot to spend and it is heading into the Christmas season so I would appreciate a prompt an immediate response so I do not have to contact Amazon thank you Amelia Blaska
I**V
It’s really helpful
Perfect set for my hair!
D**A
A good care for my skin head
A good care for my skin head
Trustpilot
2 months ago
3 weeks ago